Carbon Fiber Strengthening and Salt Resistant Coating

Problem vs Solution
       
  • Long-term exposure to salts caused significant corrosion and spalling of concrete
  •    
  • Salt Processing Facility could not shut down and required careful planning to allow for the StrongHold™ Repair System to be installed
  •    
  • StrongHold™ was designed with supporting structural calculations to restore the strength lost due to corrosion and provide long-term protection of the beams and walls
  •    
  • StrongHold™ was installed under carefully planned & executed environmental conditions to prevent contamination of surface preparation
  •    
  • Service life was extended by 20 years and the Salt Facility remained operational during the entire installation
  •  