No items found.

Fertilizer Plant Column Repair

Industrial Carbon Fiber Strengthening with Caustic Resistant Coating

Problem vs Solution
       
  • Long-term exposure to caustic fertilizer caused significant corrosion and spalling of concrete
  •    
  • The processing area supported by columns was in jeopardy of collapse
  •    
  • HJ3's forensic engineering team assessed the damage and developed a comprehensive plan to restore strength and stabilize the structure during installation
  •    
  • Multiple crews worked double shifts to simultaneously execute surface prep and StrongHold™ installation
  •    
  • Service life was extended by 20 years
  •  

   See the before and after photos below.

get started

Request a quote, and we'll get back to you within 24 hours.

Request a quote