June 12, 2022
Blog

Bridges Built with Carbon Fiber

Carbon fiber isn't just for repairing bridges. Many bridges worldwide have actually been built with CFRP because of its longer life and reduced maintenance.

CFRP cable strands and tendons were used in the construction of the Bridge Street Bridge. Credit: michigan.gov

Exploring CFRP Bridges: The Future of Construction

HJ3 has been at the forefront of bridge rehabilitation using carbon fiber, with impressive results. While carbon fiber is well-established as an innovative rehabilitation material, it's surprising how little we hear about bridges constructed with carbon fiber reinforced polymers (CFRP). The potential is vast. Building bridges from CFRP materials could substantially increase their longevity, potentially doubling or even tripling current design life expectancies. So, why don't we hear more about CFRP bridges? As it turns out, CFRP bridges already exist in various parts of the world.

The first CFRP bridge in the United States, known as the Bridge Street Bridge in Michigan, was constructed in 2003. It was designed and built by researchers at Lawrence Technical University. This innovative bridge replaced traditional black steel reinforcement with a combination of stainless steel and carbon fiber materials. CFRP components include straight and bent bars for non-tensioned reinforcement, as well as pre-tension carbon fiber strands, prestressing CFRP tendons, non-prestressing carbon fiber composite cable strands, and carbon fiber mesh fabric. This bridge has achieved remarkable success over its 11 years of service, earning it the title of "the bridge of the future" from Michigan Governor Rick Snyder.

CFRP bridges are also gaining prominence in Europe, where many are designed for pedestrians and cyclists. However, it's likely that this success will soon extend to road bridges. The West Mill Bridge in Oxford, UK, constructed in 2002, is considered "one of Europe's most advanced highway bridges" despite its relatively modest length of 10 meters. This bridge boasts load-carrying beams, side paneling, and a bridge deck made from composites. The wearing surface is polymer concrete, while all load-carrying elements consist of polyester, glass, and carbon fibers. What's more, the entire bridge was built at a temporary factory near the site and installed in under 30 minutes.

The advantages of using CFRP components in bridge construction are numerous, including:

  1. Shortened construction phase
  2. Rapid installation
  3. Resistance to water, de-icing salt, and frost
  4. Corrosion resistance
  5. Extended service life
  6. Minimal maintenance costs
  7. Low operation costs
  8. Reduced traffic disruptions due to maintenance
  9. Lower mass, allowing for simplified transportation and assembly
  10. Exceptional durability
  11. Resistance to chemicals from spillages
  12. New aesthetic possibilities
  13. Enhanced geometric efficiency

For more information on using carbon fiber for bridge repair or construction, feel free to reach out to us at info@hj3.com.

LATEST NEWS and BLOG

Learn More

Combating Pipeline Corrosion: The Benefits of Composite Repairs
Blog
December 20, 2024

Combating Pipeline Corrosion: The Benefits of Composite Repairs

Pipeline corrosion is a persistent threat. With over a quarter of pipeline incidents in 2023 caused by corrosion (PHMSA), it’s important to find long-lasting, compliant repair solutions. Composites have become a widely accepted repair method for corrosion in the pipeline industry. With benefits like reduced downtime, corrosion resistance, and cost-effectiveness, they are a great alternative to traditional steel sleeve repairs. Read our latest article to learn more about the advantages of composite repairs for pipeline corrosion!

The Truth Behind Compliant Composite Repairs: Matching Standards to Real-World Defects
Blog
October 30, 2024

The Truth Behind Compliant Composite Repairs: Matching Standards to Real-World Defects

Ensure the safety and durability of your assets by following essential repair standards for composite repairs, like ASME PCC-2, especially for high-pressure, high-temperature environments. However, matching repair designs precisely to defects is critical, as one-size-fits-all approaches may lead to failures. Avoid costly rework by providing engineers with detailed defect information to tailor repairs effectively. Learn more about aligning standards with real-world applications to enhance repair success.

get started

Request a quote, and we'll get back to you within 24 hours.

Request a quote